CONCRETE

Cubic Yard Calculator.

Convert rectangular project dimensions into cubic yards for concrete, soil, gravel, mulch, or fill.

Use feet and inches or metric dimensions to estimate cubic yards; material density and supplier weight conversions need separate inputs.

IMPERIAL + METRIC · LIVE CALCULATION
CUBIC YARD CALCULATOR — CALCULATE
Calculated result: 1.48 yd³
YOUR RESULT1.48 yd³

120 ft² footprint at the entered depth.

BASE BREAKDOWN
Cubic metres1.13 m³
Cubic yards1.48 yd³
Calculated in your browser

Formula & methodology

Volume in cubic yards = length × width × depth in feet ÷ 27. Metric inputs are converted to cubic yards.

Worked example

A 15 ft × 8 ft bed at 3 in deep is 1.11 yd³. Add a waste allowance separately if the material settles.

Before you order

  1. Use the material’s finished depth, not the loose excavation depth.
  2. For multiple beds, calculate each rectangle and add the cubic yards.
  3. Ask the supplier whether they sell by “yard” as a cubic yard or by weight.

Questions people ask

How many cubic feet are in a cubic yard?

One cubic yard contains 27 cubic feet.

Does one cubic yard always weigh the same?

No. Soil, gravel, mulch, and concrete have different densities, so weight requires a material-specific estimate.

PRACTICAL GUIDE

Cubic Yard Calculator guide

Use this calculator to estimate the volume of a rectangular excavation, fill, mulch bed, gravel layer, soil area, or similar bulk-material space in cubic yards. Measure the actual length, width, and average depth of the material zone rather than the outside dimensions of a container or project.

The result is geometric volume, not an automatic purchase quantity. Loose and compacted density, settlement, moisture, bulking, irregular grades, supplier load sizes, and project waste can all change how much material should actually be ordered.

FORMULA AND VARIABLES

How the calculation works.

FormulaCubic yards = (length ft × width ft × depth ft) ÷ 27
  • length and width = rectangular plan dimensions in feet
  • depth = material thickness converted to feet
  • 27 = cubic feet in one cubic yard
WORKED EXAMPLE

Follow the numbers in context.

12 ft × 10 ft area at 4 inches deep

Convert 4 inches to 4 ÷ 12 = 0.3333 ft. Volume is 12 × 10 × 0.3333 ≈ 40 cubic feet. Divide by 27 to get about 1.48 yd³. That is the geometric volume before any ordering allowance or supplier rounding.

Split an L-shaped bed instead of averaging it

If one rectangle is 10 ft × 6 ft and another is 4 ft × 3 ft, both at 3 inches deep, calculate each rectangle separately and add the cubic-yard results. This avoids counting the empty corner of the L shape.

WHAT THE RESULT TELLS YOU

Use the number for the question this tool answers.

Read the result as the volume occupied by the entered rectangular dimensions. A result of 1.48 yd³ does not by itself mean that exactly 1.48 yd³ should be purchased.

Before ordering, confirm whether the supplier quotes loose, compacted, or delivered volume and whether a project-specific allowance is appropriate. Keep that commercial decision separate from the geometric calculation.

More detail: inputs, assumptions, mistakes and edge cases
HOW TO USE IT

Build a dependable estimate.

  1. Measure the filled footprint, then measure or choose the intended material depth.
  2. Keep dimensions compatible. Convert inches of depth to feet before doing a manual cubic-foot calculation.
  3. For irregular plans, split the project into simple sections and add their volumes instead of forcing one bounding rectangle.
  4. Treat the displayed cubic yards as geometric volume, then apply supplier-specific compaction, waste, or load-size guidance separately when ordering.
UNITS AND INPUTS

Keep measurements compatible.

One cubic yard equals 27 cubic feet because a yard is 3 feet in each of three dimensions: 3 × 3 × 3 = 27. A depth in inches must therefore be converted before multiplying dimensions expressed in feet.

Cubic yards measure volume, not weight. Converting yards to tons requires a material-specific bulk density; there is no single correct yards-to-tons factor for soil, gravel, sand, mulch, or concrete.

ASSUMPTIONS AND LIMITATIONS

Know what the result includes.

Assumptions

  • The core formula represents a rectangular prism with a uniform depth.
  • Entered dimensions describe the space to be filled, not merely the overall project boundary.
  • The calculation reports geometric volume and does not silently add a waste or compaction percentage.

Limitations

  • Sloped excavations, tapered trenches, cylinders, cones, curved beds, and changing depths require shape-specific calculations or subdivision into sections.
  • The calculator does not predict compaction, settlement, excavation swell, moisture change, truck capacity, supplier minimums, or material density.
  • For structural concrete or engineered fill, quantity is only one part of the job; specifications, reinforcement, subgrade preparation, placement, and local requirements remain separate.
COMMON MISTAKES

Avoid preventable errors.

  • Using 4 as feet when the intended depth is 4 inches can overstate volume by a factor of 12.
  • Dividing square feet by 27 without first multiplying by depth omits the third dimension.
  • Treating cubic yards as tons assumes a density that the volume calculation does not know.
  • Rounding every intermediate measurement aggressively can compound error on large areas.
EDGE CASES

Check unusual inputs carefully.

For a varying depth, take enough representative depth measurements to justify an average, or divide the area into zones with different depths.

For very thin layers, small depth errors can change the result materially; measure thickness carefully rather than relying on a nominal label.

If material is sold only in whole bags, pallets, scoops, or truck increments, convert the geometric result using that supplier’s stated package or load coverage.

Subtract known voids only when they genuinely displace material throughout the relevant depth.

FAQ

Questions about this calculation.

Why do you divide cubic feet by 27?

A cubic yard is 3 ft × 3 ft × 3 ft, which equals 27 cubic feet.

How do I use a depth measured in inches?

Convert inches to feet by dividing by 12 before multiplying by dimensions in feet.

Are cubic yards the same as tons?

No. Cubic yards measure volume; tons measure mass. A conversion requires the bulk density of the specific material.

Should I automatically add 10%?

No universal allowance fits every material and project. Use supplier or project guidance for compaction, waste, settlement, and ordering increments.

How do I calculate an irregular area?

Split it into rectangles or other known shapes, calculate each section, and add the volumes.

Can I use this result for concrete?

It can estimate rectangular geometric volume, but concrete ordering may also need allowances and project-specific details. Use the dedicated Concrete Calculator for concrete-specific planning.

RELATED TOOLS AND GUIDES

Continue the calculation.

Our other websites

Explore more websites from the same owner, each built for a different purpose.

About our website network